Planner
Count back from opening night
Change the date or the package and the milestones move. Every step here is one of the seven above.
Estimates only. Holidays and customs time aren’t included.
Inspection
What we check before anything ships
Reports include photographs and are sent with each shipping notice.

01
Overall dimensions within 3 mm of the drawing
02
Finish color and sheen against the signed sample, under 2700K and daylight
03
Drawers, doors and hinges: full travel, soft close, alignment
04
Upholstery: pattern match, seams, welts and fill
05
Lighting: wiring, UL label, dimming test and lamp color temperature
06
Levelers, glides and wall cleats fitted
07
Packaging labeled by floor and room, with corner protection
Delivery
The last week is the one guests notice
Most furniture failures at opening aren’t manufacturing failures. They’re a pallet at the wrong dock, a crew without the right tools or a headboard nobody has fixed to the wall. Our own crews install every project we build: floor by floor, room by room, with the project lead on site.