What a shop drawing should tell you, and what to check before you sign
A designer’s drawing says what a piece should look like. A shop drawing says how it will be built. Once you sign it, it’s the document production works from, so it’s worth ten careful minutes.
What every Furn shop drawing includes
Three views and a section, at a scale you can measure from, with overall and critical dimensions.
Joinery and construction notes: how the frame is built, what’s solid and what’s veneer, where the hardware fixes.
Materials and finishes by library code, or COM reference, against each surface.
Hardware: runners, hinges, pulls, glides and levelers by model.
Electrical, for any piece with lighting or power: fixture, lamp, switch position and cable route.
Tolerances, usually ±3 mm on overall dimensions.
Six things to check before you sign
The section. Plan and elevation can look right while the section hides a problem: a drawer too shallow for a hairdryer, or a toe-kick too low for the vacuum.
Grain direction and veneer match. On wide pieces we show which way the grain runs and whether faces are book-matched or slip-matched. If it matters to the design, say so here.
Edges that take abuse. Guestroom case goods are hit by carts and luggage. Check where we’ve specified solid edging or a kick plate, and where we haven’t.
Clearances. Measure against the room, not just the drawing: door swings, outlet heights, headboard walls and the bed width the brand actually uses.
Hardware finish. Pulls and hinges often come from a different supplier than the timber. Make sure the finish codes match the lighting and plumbing fixtures in the room.
What the drawing doesn’t show. Anything left as “to match designer’s sample” needs a physical sample before production. We’ll ask for one; it’s faster if it arrives with the signed drawing.
How revisions work
Mark up the PDF and send it back. We revise and reissue with a new revision letter and a cloud around every change, so nobody approves an old version by accident. Most custom pieces are signed in one or two rounds. The Larkspur’s cane nightstand took three, because we redesigned the joint where the cane panel meets the frame.
After you sign
The signed drawing goes to the plant with the approved finish sample, and nothing changes without a new revision. If a detail turns out to be unbuildable at the price, we’ll stop and show you the option on paper. We won’t quietly simplify it.
Written by
Lucía Ferreira
Head of Design Development
Journal
Keep reading

Counting back from opening night: when to order FF&E
Most FF&E delays are baked in before anything is built. Here’s how to count back from your opening date, week by week.
2 min

COM without the surprises: minimums, testing and lead time
Customer’s own material is the most common reason a custom seating order slips. How much to send, what we test and how to keep it on schedule.
2 min

Specifying decorative lighting for hospitality: color, dimming and glare
A fixture that looks right in the showroom can look wrong in the room. Color temperature, dimming and glare, and how to specify each.
2 min